September 2026 documentation records localized metal-roof repair and coating, followed by later reports of recurring leaks.
North Charleston, South Carolina · Commercial property
The September work
The September 10 report documents contractor-reported repair and coating over an approximately 700-square-foot area, with preparation and finished-detail photographs.
The later follow-up
October messages report leakage recurring after heavy rain. The September work did not establish lasting resolution of every water-entry issue.
Keeping the gutter work separate
A later gutter project is a distinct scope. Its reported completion does not by itself establish a passing roof leak test.


